P.A.B Stripping

18 Oct 2009 20:28 #1 by OneEighthBit
P.A.B Stripping was created by OneEighthBit
Question:

As per subject has anyone ever uncovered any information on what exactly P.A.B Stripping was or even what P.A.B stands for?

The nearest I've come to it is page 50/51 of The Royal Airforce Builds for War where is mentions the Aerodrome Improvement Board visited airfields and laid down "stripping" plans.

I believe this "strips" are what are shown on site plans as the funnel lines drawn to meet at the runway ends and denote runway approaches or defined landing "strips"

Can anyone expand?

Please Log in or Create an account to join the conversation.

18 Oct 2009 20:43 #2 by OneEighthBit
Replied by OneEighthBit on topic P.A.B Stripping
Actually, semi-disregard last message. :) If I'd read forward to Chapter 3 it expands a little on it.

Just curious though, does anyone know what P.A.B stands for?

Please Log in or Create an account to join the conversation.

18 Oct 2009 21:26 #3 by Paul Francis
Replied by Paul Francis on topic P.A.B Stripping
Where is the reference to PAB as I have never heard of it PAP and PBS and PSP all yes but PAB no!

You can tell a builder from an archaeologist by the size of his trowel. Mine is a small one!

Please Log in or Create an account to join the conversation.

18 Oct 2009 22:21 #4 by OneEighthBit
Replied by OneEighthBit on topic P.A.B Stripping
Well on most of the site plans I have there is usually a small scale insert in the corner near the schedule of buildings that shows the general area and it's marked on those. It's labelled as "P.A.B Stripping" which I assume is the "Stripping" as defined by the Aerodrome Improvement Board as the standard landing "lanes" for aerodromes. I think the P.A.B is an acronym for "something" Air Board rather than any reference to a surface type.

Having a chance to take a look in some books, stripping is mentioned in David J. Smiths "Britains Military Airfields 1939-1945" on page 24/25 and Chapter 3 of "The Royal Airforce Build for War".

As I said, I just wondered what P.A.B might be short for.

Please Log in or Create an account to join the conversation.

19 Oct 2009 01:44 #5 by P Bellamy
Replied by P Bellamy on topic P.A.B Stripping
Provisional Aerodrome Boundary?

Paul Bellamy

Please Log in or Create an account to join the conversation.

19 Oct 2009 07:26 #6 by Ossington_2008
Replied by Ossington_2008 on topic P.A.B Stripping
I too have always wondered what PAB stripping is:

This image is hidden for guests.
Please log in or register to see it.



If it covered these runway lanes, it must have been substantial stuff requiring periodic maintenance, other wise why mark it on a site plan? I have always imagined it as a perforated relative to the tarred hessian used for runway consolidation.

Please Log in or Create an account to join the conversation.

19 Oct 2009 08:19 #7 by OneEighthBit
Replied by OneEighthBit on topic P.A.B Stripping
To repeat - it's not a physical strip. It's just a mark on the plan to designate the landing lanes/strips and approaches. To quote from "The Book":

The Class 'A' Standard Operational Airfield 1942-1945

The Strips. The three strips were planned as far as practical at angles of 60 degrees to each other, the mainstrip of 2,000 yards x 400 yards and the two subsidiary strips of 1,400 yards by 200 yards.


It also states that the approaches funnel out from the ends of the strips at 15 degrees with a 1:15 vertical approach.

So the stripping was the AIB defined areas, clear from obstruction, which defined landing area's. Some airfields had one, some two, three, etc.

Please Log in or Create an account to join the conversation.

19 Oct 2009 08:31 #8 by mawganmad
Replied by mawganmad on topic P.A.B Stripping
Surely the word strip, just means the runway or landing area.
Still don't get PAB though?
I've never seen it on my site plans, it's not something And Buildings for example?
And what is AIB? We need a a page of definitions I fancy!

James Thomas

Please Log in or Create an account to join the conversation.

19 Oct 2009 08:43 #9 by Paul Francis
Replied by Paul Francis on topic P.A.B Stripping
Yes thats right the strip is a clearance zone, free from obstructions. Before hard surface runways they were also called flightways or even landing lanes. Runways were often built down the centre line of these (though not always).

AIB = Aerodrome Improvement Board

We have an abbreviations list but its no where near finished MM and its 30 pages todate!

You can tell a builder from an archaeologist by the size of his trowel. Mine is a small one!

Please Log in or Create an account to join the conversation.

19 Oct 2009 22:30 #10 by carnaby
Replied by carnaby on topic P.A.B Stripping
Google revealed that PAB can mean Peek A Boo (children's game), Pick A Brick (Lego shop), Punk Ass Bitch, Peanut Advisory Board, Progressive Adult Beverage (alcohol product), People Against Boredom, and dozens of other less crazy things.

However AP3384 (1967) RAF Layout Specifications and Safeguarding Criteria for Permanent Aerodromes' (AIR10/9223) uses the term 'Prepared Area' on several occasions. Is this the clue?

Graham

Plan A is always more effective when the problem you are working on understands that Plan B will involve the use of dynamite :twisted:

Please Log in or Create an account to join the conversation.

Time to create page: 0.045 seconds
Powered by Kunena Forum

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of this site have already been set. By continuing to use this site you are agreeing to this. To find out more about the cookies we use and how to delete them, see our privacy policy.

  
EU Cookie Directive Module Information