Most WW2 built temporary brick buildings for airfields consisted of walls of a single brick thickness (4-1/2 inches) laid in stretcher bond. Externally, there were 'piers' spaced at intervals which, in most cases, suppported the ends the trusses where a pitched roof was employed.
Not being an architect or builder, I have some queries:
Most buildings appear to have 'piers' on the ends of the building. On a nominal 18 foot wide building these are spaced 6 feet apart in the centre. Usually a door or doors or even a window was located between them.
1. Were 'piers' bonded to the wall during construction so that they actually braced the wall or were they just stacked to support the trusses.
2. What was the purpose of the end piers?
3. Some AM drawings call for floors to be 'C.F. Finish' (could be G.F). What is that?
4. Some AM Drawings call for the roofing material to be 'A.C. Decking'. What is that?
5. Some building types had 9 inch thick walls with pitched roofs but no piers so, presumably, the additional thickness of wall supported the roof trusses. Any comments?
6. I have used the term 'piers' having seen it it some references but is that the correct architectural term?
7. An AM Drawing 1934/43 for a munitions store shoes the Type D building as 9 feet wide and does not indicate any roof trusses. Does that mean it had a flat roof? (this is the one that calls for A.C. Decking)
piers are bonded by ties.
end piers are there for strength (cause of the door opening providing a natural weakness) and they support purlins which support the roof sheeting
CF is 'cement finish'
AC is asbestos cement
9in brick walls are generally important service buildings, piers not required.
piers is correct
the term 'decking' is usually applied to flat roofs made from ribbed or trough-shaped AC sheets (rather than completely flat, the rib or trough providing strength and sometimes this is clad with cement) or steel decking.
Lesson Over!
You can tell a builder from an archaeologist by the size of his trowel. Mine is a small one!
I assumed the piers were built into the walls and were part of the entire structure, that was until i visited Deopham Green a few weeks ago and noticed that the Ablution block had one pier laying over at an angle and it wasn't ' knitted ' into the wall.
I assumed the piers were built into the walls and were part of the entire structure, that was until i visited Deopham Green a few weeks ago and noticed that the Ablution block had one pier laying over at an angle and it wasn't ' knitted ' into the wall.